CASE STUDIES
PROJECTS
Our online dredging robots repeatedly deliver outstanding results across all projects undertaken. To find out more, view our case studies.
Mount Holland Lithium Mine, Covalent Lithium
Client: Covalent Lithium
Dredging of their HDPE lined process water pond while kept in full operation
Robotic Dredging in a Remote Gold Mine in Papua New Guinea
Client: Unnamed Gold Mining Client
Process water tank dredging while maintaining full operational capacity.
Fully Customised Liner-safe Dredging Solution
Client: Global Mining Company
Safely cleaned a lined wastewater tank within a compressed time frame, saving the company significant downtime costs.
Dredging Wastewater Treatment Pond
Client: Major Australian Utility
Used custom robotic technology to desludge a wastewater treatment pond and deliver a 100% clean.
Dredging HDPE Lined Clean-Water Pond
Client: Energy Australia
Safely cleaned the pond back to the bare liner while online without any turbidity or impact on Plant operations.
Get in Touch
Find out how you can save time and money with our online robotic dredging solutions.