Port Hedland Dredging,

Servicing the Pilbara

Designed & Built in Perth

Eliminate Downtime

Advanced underwater positioning technology

Operation in corrosive and extreme pH environments (pH 1 to pH 14)

Save Time & Money

A Dredging Team Already Based in the Region

 

Sediment doesn’t stop accumulating just because a site is remote. Around Port Hedland’s port and processing infrastructure, and across the wider Pilbara, tailings ponds, process tanks and cooling basins all lose capacity to settled solids over time.

Dredge Robotics delivers Port Hedland dredging and mining dredging services from a base already in the region: Newman. We work with resource operators across Port Hedland, Newman, Tom Price, Paraburdoo and Karratha, clearing sediment, sludge and debris from water assets while those assets keep running. No drain-down, no shutdown, no entry required.

New robotic dredge image

Why Robotic Dredging Beats the Traditional Method

The traditional approach to industrial dredging and pond maintenance hasn’t changed in decades: drain the asset, isolate it, sometimes cut into it, then send people or machinery in. It’s slow, it’s expensive, and it puts people inside a confined, contaminated space to do it.

Our model removes each of those costs in turn:

  • The asset never goes offline: Remediation runs in parallel with production, not around it.
  • Your water stays where it is: A closed-loop process means there’s no drain-down, preserving water that’s expensive and slow to replace.
  • No one enters the asset: Removing human entry eliminates the highest-risk activity in this category of work.
  • We already know how to mobilise here: Being Newman-based, we plan around the same DIDO/FIFO rosters, access windows and travel distances every Pilbara operation already works around: Port Hedland, Karratha, Tom Price and Paraburdoo included.

What We Dredge, Clean and Maintain

Lined pond dredging: Liner-safe clearing of sediment and sludge from evaporation ponds, process ponds and turkey’s nests, engineered to protect HDPE and PVC linings even in low-visibility water.

Mine site dredging: Tailings pond dredging, slurry and process tanks, and return water dams maintained for tier-one iron ore operators without disrupting production schedules.

Process and storage tank cleaning: Online desludging of process and storage tanks, removing compacted material with no interruption to service delivery.

Cooling tower maintenance: Sediment cleared to recover thermal performance, particularly relevant given the region’s ambient temperatures.

Mine dewatering: GPS-guided desludging and dewatering of process ponds, tailings dams and retention basins, all while operations continue.

tank cleaning australia

Internationally recognised certifications and accreditations.

LINED PONDS

LINED PONDS

Lined ponds may be common, however, the delicate nature of the lining can add challenges to dredging the traditional way. See how robotic dredging in Australia can restore your HDPE, LLDPE and PVC lined ponds with zero risk of damage, even with minimal visibility. 

TANKS

TANKS

Maintaining process and storage tanks is essential, but often requires shutting down operation to do so. Not with Dredge Robotics. We have revolutionised cleaning and inspecting tanks without shutting down your mining, manufacturing or other operations. Learn how. 

WASTEWATER DESLUDGING

WASTEWATER DESLUDGING

Using online robotic dredging technology with pinpoint GPS tracking, we can desludge and clean wastewater ponds, raceways, digesters, oxidation ditches and sediment tanks without stopping operations or requiring entry from divers or your team. Explore more. 

CHEMICAL PONDS

CHEMICAL PONDS

Our dredging contractors in Australia can operate our online robotics in highly corrosive and extreme pH environments (pH 1 to pH14), allowing you a safer, more efficient and cost-effective method of cleaning and inspecting chemical tanks. 

No Entry. No Downtime. Just Clean Results.

Removing personnel from confined, contaminated mine site water environments eliminates the highest-risk activity in this category of work outright, before you even get to the cost and time saved from not draining the asset.

 

CASE STUDIES

Having worked with WA’s commercial and industrial powerhouses, we consistently deliver 100% clean results with no turbidity or impact to operations. Explore our case studies to see how our team approaches different sites and challenges.

Behind the Technology & Innovation

There is truly no other robotic dredging company working the Pilbara like our custom-designed, patented technology at Dredge Robotics. Learn more about how we engineered this system specifically for Australia’s toughest mine site conditions.

Get in Touch

Find out how you can save time and money with our online robotic dredging solutions.

Frequently Asked Questions From Pilbara Site Managers

Which Pilbara regions do you offer dredging services in?

We mobilise to mining and export operations across the Pilbara, including Newman, Port Hedland, Karratha, Tom Price and Paraburdoo. Being based in Newman ourselves, remote logistics and long-distance mobilisation are part of our normal operating environment.

Can you really dredge a tailings or process pond without taking it offline?

Yes. Because our robots operate inside the asset while it stays full and in service, there’s no drain-down and no shutdown.

Will robotic dredging damage my pond liner?

No. Liner protection is engineered into the system end to end: trackless drives, torsion limiting, and a sensor suite that maintains precise control in nil-visibility water. We clear sediment back to bare liner without compromising it.

How do you handle mobilising to a remote Pilbara site?

Being Newman-based, we’re not planning a first trip to the region. We already work around the access windows, rosters and travel distances that define operating here.