by admin | Aug 22, 2024 | Case Study
Lined Pond Dredging – Mount Holland Lithium Mine, Covalent Lithium Dredge Robotics were contracted by Covalent Lithium to undertake dredging of their HDPE lined process water pond at Mount Holland. Using our proprietary liner-safe robotic dredging technology, we were...
by admin | Jul 30, 2024 | Case Study
Background An unnamed gold mining client in Papua New Guinea faced a unique and challenging situation. The remote location of their asset, combined with the necessity to keep the process water tank in operation, required an innovative approach to dredging. Shutting...
by admin | Feb 19, 2024 | Case Study
THE PROBLEM A major Australian utility required an online robotic dredging solution to clean its wastewater treatment pond. THE CHALLENGE Providing an online robotic dredging solution capable of operating in very shallow water depths and nil visibility while...
by admin | Feb 19, 2024 | Case Study
THE PROBLEM Energy Australia required a solution to safely dredge its HDPE lined clean-water pond without taking it offline or creating turbidity. THE CHALLENGE Developing a robotic solution capable of safely dredging the asset, without turbidity, while it remained...
by admin | Feb 15, 2024 | Case Study
Dredge Robotics was approached by a global mining company with a requirement to remove accumulated organic sediment from a lined tank with a thin and fragile liner. The tank had accumulated a blanket of sediment that was impacting the operation of the asset and...