Mount Holland Lithium Mine, Covalent Lithium

Mount Holland Lithium Mine, Covalent Lithium

THE PROBLEM Covalent Lithium faced the challenge of removing accumulated sediment from their HDPE lined process water pond at Mount Holland. The sediment buildup was impacting the pond’s capacity and required immediate attention. However, the project had to be...
Robotic Dredging in a Remote Gold Mine in Papua New Guinea

Robotic Dredging in a Remote Gold Mine in Papua New Guinea

THE PROBLEM Client: Unnamed Gold Mining Client Location: Remote area in Papua New Guinea Scope: Process water tank dredging while maintaining full operational capacity Challenges: Remote location, continuous operation of the asset, challenging environmental conditions...
Dredging Wastewater Treatment Pond

Dredging Wastewater Treatment Pond

THE PROBLEM A major Australian utility required an online robotic dredging solution to clean its wastewater treatment pond. The pond was heavily laden with sludge, sediment, rocks and foreign objects, which posed a significant challenge to traditional cleaning...
Dredging HDPE Lined Clean-water Pond

Dredging HDPE Lined Clean-water Pond

THE PROBLEM Energy Australia required a solution to safely dredge its HDPE lined clean-water pond without taking it offline or creating turbidity. The pond’s continuous operation was crucial to avoid any disruptions that could lead to a station outage, making...
Fully Customised Liner-Safe Dredging Solution

Fully Customised Liner-Safe Dredging Solution

THE PROBLEM Dredge Robotics was approached by a global mining company facing a critical issue with a lined tank that had accumulated a blanket of organic sediment. This sediment was significantly impacting the operation of the asset and required immediate...