by admin | Aug 22, 2024 | Case Study
THE PROBLEM Covalent Lithium faced the challenge of removing accumulated sediment from their HDPE lined process water pond at Mount Holland. The sediment buildup was impacting the pond’s capacity and required immediate attention. However, the project had to be...
by admin | Jul 30, 2024 | Case Study
THE PROBLEM Client: Unnamed Gold Mining Client Location: Remote area in Papua New Guinea Scope: Process water tank dredging while maintaining full operational capacity Challenges: Remote location, continuous operation of the asset, challenging environmental conditions...
by admin | Feb 19, 2024 | Case Study
THE PROBLEM A major Australian utility required an online robotic dredging solution to clean its wastewater treatment pond. The pond was heavily laden with sludge, sediment, rocks and foreign objects, which posed a significant challenge to traditional cleaning...
by admin | Feb 19, 2024 | Case Study
THE PROBLEM Energy Australia required a solution to safely dredge its HDPE lined clean-water pond without taking it offline or creating turbidity. The pond’s continuous operation was crucial to avoid any disruptions that could lead to a station outage, making...
by admin | Feb 15, 2024 | Case Study
THE PROBLEM Dredge Robotics was approached by a global mining company facing a critical issue with a lined tank that had accumulated a blanket of organic sediment. This sediment was significantly impacting the operation of the asset and required immediate...